Water Treatment
Water and Sewer Authority (WASA), Washington D.C
AKAL is undertaking a major renovation of the existing Nitrification Sedimentation Basin and Nitrification Control Buildings, conducting various site surveys and investigating the existing structural work and the existing HVAC system in the control building.
Prison Point CSO Facility, MWRA, Cambridge, MA
AKAL was hired by EarthTech Engineering firm to assist in the investigation and to provide recommendations for the rehabilitation of the facility’s Odor Control Problem. The Prison Point CSO facility was constructed in 1981. The 8,000 s.f. facility is undergoing various upgrades to assess and address its odor control and HVAC ventilation problems.